Full house renovations

Whole house refurbishment, sequenced so trades are never waiting.

A whole house is not eight small jobs. It is one programme where the rewire has to finish before the plasterer starts and the bathroom has to be tanked before the tiler arrives. Getting that order right is most of what you are paying for.

A full renovation brings a tired house up to date in one programme: strip out, structural changes, rewiring, replumbing and heating, new kitchen and bathrooms, plastering, flooring and decoration. It suits a house you have just bought, or one that has not been touched in decades.

The order of work matters more than anything. First fix electrics and plumbing go in before plastering, bathrooms are waterproofed before tiling, and floors go down after the messy trades have finished. We plan the whole programme before we start, so you know what happens each week.

The price depends on the size of the house, how much of the structure changes, the heating system you choose and the finishes. We price from a detailed scope of works, room by room, and payments are staged against work completed.

What is included
  • Strip out and waste management
  • Full rewire with a new consumer unit and certification
  • Replumb, new boiler and heating design
  • Structural openings and steels where walls come out
  • Bathrooms tanked, tiled and fitted
  • Kitchen supply and installation
  • Plastering, flooring and decoration throughout
  • Fitted joinery and wardrobes as part of the same programme

Typical duration: 12 to 24 weeks depending on size

Get a free quote
Common questions
Do we need to move out?

For a full house, usually yes, and it works out cheaper. An empty house lets trades overlap instead of working room by room around you.

How do payments work?

Staged against work completed, agreed in writing before we start. You are never paying for work that has not happened.

Who certifies the electrics and gas?

Our own registered electricians and gas engineers, and you get the certificates at handover along with the Building Control sign off.

Can a renovation be done in stages?

Yes, if the budget needs it. We plan the stages so the first one does not have to be undone by the second, for example by running new cables and pipes in rooms you will finish later.

Our full renovations work
Full renovations by All In One Builders, photograph 1
Full renovations by All In One Builders, photograph 2
Full renovations by All In One Builders, photograph 3
How a job runs
Free survey

We visit, measure up and talk through what you want. No charge and no obligation.

Fixed written price

Drawings and calculations where the job needs them, then a price in writing before anything starts.

One team builds it

Our own trades, sequenced so nobody is waiting, with staged payments against work completed.

Sign off and handover

Building Control completion, electrical and gas certificates, a snagging walk round and a clean house.